Heating circuit water check before commissioning
Heating circuit water check: what should be verified before commissioning? When a heating circuit is filled for the first time, the quality of the water introduced into the system can influence start-up, adjustments and the long-term durability of the equipment. Water that is too hard, too rich in dissolved salts, unsuitable for some materials or…
Learn moreLire l'article

